Friday 7 September 2012

Plans for the first 2D fieldwork

The first 2D fieldwork is planned for September, 15th and 16th.
The equinoctial spring tide will (hopefully) provide some extra centimeters to the water level which may be enough to overwash the barrier.


What we are asking Poseidon is to provide us the oceanogaphic conditions to keep the area to the right (photo below) wet, with the instruments measuring overwash flow; and the area to the left dry with the base station, tents, computers, ...
Small elevation in the backbarrier , suppose to be 'safe', where the base station will be set.

Top of the barrier, where instruments will be deployed.





No comments:

Post a Comment